Turboden to supply a 10 MW heat recovery ORC unit for Arvedi steel plant in Italy — Green Car Congress

RENEWABLE ENERGY –SOLAR AND BIOMASS PLANTS IRR 16 to  25% RTB

INCOENERGY provide full assistence in Brazil

– Ready projects  RTB.

-Business Plan national model , Financing 70% CAPEX

– All contracts SPV,  Consortium , Company contract, Purchase Contract  PPA…

Email: diretoria@incoenergy.com.br

WEBSITE: www.incoenergy.com.br

Improvement New Concept OEnergy

NEWS:

Turboden, a group company of Mitsubishi Heavy Industries (MHI), leader in Organic Rankine Cycle (ORC) turbogenerators for distributed power generation employing renewable sources and waste heat, has signed an order with Acciaieria Arvedi for a 10 MW waste heat recovery ORC unit to be installed at the Arvedi Steel plant in Cremona, Italy. The Turboden…

via Turboden to supply a 10 MW heat recovery ORC unit for Arvedi steel plant in Italy — Green Car Congress

Anúncios

Deixe um comentário

Preencha os seus dados abaixo ou clique em um ícone para log in:

Logotipo do WordPress.com

Você está comentando utilizando sua conta WordPress.com. Sair / Alterar )

Imagem do Twitter

Você está comentando utilizando sua conta Twitter. Sair / Alterar )

Foto do Facebook

Você está comentando utilizando sua conta Facebook. Sair / Alterar )

Foto do Google+

Você está comentando utilizando sua conta Google+. Sair / Alterar )

Conectando a %s